John Holland McConnell Dowell JV – Land Transport Authority (LTA) Jurong Region Line (JRL) J108 Project

, Past Projects 2021

In early 2020, LTA awarded a contract for 3 stations on the Jurong Region Line to a Joint Venture between John Holland Pty Ltd and McConnell Dowell South East Asia Pte Ltd. Scheduled to be completed in late 2026, the contract forms part of the new Jurong Region Line MRT development by LTA, which involves the construction of Tengah Plantation Station, Tengah Park Station, Bukit Batok West Station and Viaduct. The 150m long station platforms will be linked by 2.3km of elevated twin track viaducts, to support both existing and future development, as well as significantly improve connectivity of the region to serve the community living in the western parts of Singapore.

Hence, having been involved in multiple LTA projects and having worked with McConnell Dowell in the past, Jenmon was honoured 

, Past Projects 2021
, Past Projects 2021

to be appointed by John Holland McConnell Dowell Joint Venture to design, supply, deliver, install, test and commission 1 unit of 60/20 ton Double Girder Gantry Crane and 1 unit of 80/20 ton Double Girder Gantry Crane. To increase efficiency and reduce the cost of loading and civil works, Jenmon recommended for the 1 unit of 80/20 ton Double Girder Gantry Crane to be installed on wheels.

China Communications Construction Company Limited (Singapore Branch) – Land Transport Authority (LTA) East West Line (EWL) and Jurong Region Line (JRL) J106 Project

, Past Projects 2021

In February 2020, LTA awarded a contract for the design and construction of Boon Lay station to China Communications Construction Company Limited (Singapore Branch). This includes the design and construction of Boon Lay Station and a viaduct stretching 800m along Jurong West Street 64, as well as addition and alteration works to the existing East West Line Boon Lay Station to connect it to the new Jurong Region Line Boon Lay Station, which will be served as an interchange.

, Past Projects 2021

The construction of this station cum interchange will be China Communications Construction Company Limited (Singapore Branch)’s first railway contract in Singapore. Jenmon was thus privileged to be awarded by China Communications Construction Company Limited (Singapore Branch) to design, supply, deliver, install, test and commission 2 units of 10 ton Single Girder Gantry Cranes and 1 unit of 80+80ton Double Girder Rubber Tyred Gantry Crane.

During the course of the discussion with China Communications Construction Company Limited, the limited space at the precast yard was raised. As the flexibility from moving from one bay to another was a challenge for a 160 ton finished viaduct beam, Jenmon proposed solution was to use a Double Girder Rubber Tyred Gantry Crane. In comparison to a normal Double Girder Gantry Crane, the Double Girder Rubber Tyred Gantry Crane will be much narrower in span, increasing the productivity and lowering the cost. Jenmon hopes this the installation of this Double Girder Rubber Tyred Gantry Crane will enable China Communications Construction Company Limited to complete the construction of the station cum interchange with ease.

Scheduled to be completed in 2026, this J106 project forms part of the new Jurong Region Line MRT development by LTA, Singapore’s seventh MRT line and the first fully elevated line, without any underground stations. When fully completed in 2028, this line is expected to have a total of 24 stations and 3 interchanges, providing greater accessibility and convenience for passengers.

CKR Contracts Services Pte Ltd – Temporary Occupation License (TOL) Project

, Past Projects 2021
, Past Projects 2021

In late 2020, Building and Construction Authority (BCA) leased CKR Contracts Services Pte Ltd a Temporary Occupation License (TOL) for a plot of land with a purpose of storing precast components, Prefabricated Prefinished Volumetric Construction (PPVC), for HDB projects.

Prefabrication of components ensures consistent components quality and the construction of flats to be built in a more efficient way. Moreover, it reduces on-site labour. Overall increasing productivity and decreasing the cost.

Jenmon has been a close crane supplier of CKR Contracts Services Pte Ltd for many years, from its Sungei Kadut Headquarters cum Warehouse establishment to the supply of cranes and aftersales services. Thus, Jenmon is pleased to be awarded by CKR Contracts Services Pte Ltd for the design, supply, deliver, install, test and commission 2 units of 20t double girder gantry cranes, 1 unit of 25t double girder gantry crane and 5 units of 40t double girder gantry cranes at 22 Seletar North Link.

As Jenmon continues its quest to improve the safety and prolong the durability of the equipment supplied, click here to find out more of Jenmon’s Self Centering Device, which is incorporated into this project.