Past Projects 2016
Awarded by Sunhuan Construction Pte Ltd for 6 units of Electric Overhead Travelling Cranes and 1 unit of Monorail Crane for Substation in Jurong Island
With more than 20 years of experience in the construction industry, Sunhuan Construction Pte Ltd offers construction solutions and services for Residential, Upgrading, Alteration and Addition, Institutional, Commercial, Industrial and Civil Engineering.
Having worked with Sunhuan Construction Pte Ltd for past projects, Jenmon was thrilled to be awarded once again by Sunhuan Construction Pte Ltd to design, supply, install and commission 5 units of 5 ton
and 3.2 ton Single Girder and Double Girder Electric Overhead Travelling Cranes, completed with runway structure and iBeam corbels. In addition, 1 unit of 12 ton Monorail Crane with a span of over 17m and height of lift of 40m was provided for the construction of Jurong West Island 400KV substation on MK 34 Lot 3290X at Tembusu Avenue.
As this was a design and build project, there was a great deal of site co-ordination and discussion alongside owners, main contractor (Sunhuan), as well as other subcontractors. Thus, a dedicated team of Jenmon workers were required to ensure the project ran smoothly and followed the schedule. The estimated date of handover is in June of 2018.
Awarded by Tiong Seng Contractors (Pte) Ltd for 5 units of Gantry Cranes and Electric Overhead Travelling Cranes for Land Transport Authority (LTA) – Thomson-East Coast Line (TEL) – T220 project
Tiong Seng Contractors (Pte) Ltd has more than 50 years of experience as a building construction and civil engineering contractor in Singapore. Since the 1970s, the company was involved in the construction of Singapore’s first highways – Pan Island Expressway and Central Expressway, and later the construction of Tanjong Pagar Terminal and many other government building projects.
With several LTA projects experience, Jenmon was honoured to be awarded by Tiong Seng Contractors
(Pte) Ltd to design, supply, install and commission a total of 5 units of cranes for this project. 1 unit of 10 ton Gantry Crane, 2 units of 20 ton Gantry Cranes, 2 units of 20 ton Double Girder Electric Overhead Travelling Cranes were provided for the construction of T220 – a joint venture between Tiong Seng Contractors (Pte) Ltd and Dongah Geological Engineering Co. Ltd.
Thomson-East Coast Line – T220 project consists of the construction of Great World station, along with 2 pairs of tunnels designed to run along Havelock and Orchard stations on either end. Jenmon tailored the cranes for the station construction, which used a top down construction approach.
The estimated date of handover is in March of 2018.