Past Projects 2020

Port of Singapore Authority (PSA) Mega Yard- Tuas F2 Maintenance Base Project

, Past Project – 2020

Jenmon International Pte Ltd was awarded several projects by PSA Corporation Limited in the past. This includes, the delivery of numerous overhead travelling cranes for Pasir Panjang Terminal (PPT) 2 and 5 workshops.

Thus, Jenmon is pleased to once again be appointed by PSA. This time, to design, fabricate, supply, deliver, test, install and commission 7 units of overhead travelling cranes and 4 sets of travelling railings at Tuas F2 maintenance base.

This project is part of the government’s longstanding plan to enhance Singapore’s international port status and to become the world’s biggest container terminal- that is able to serve even the demands of the world’s biggest ships. With it set to be fully completed by 2040, this Mega Port will consolidate all the current terminals- i.e. Brani, Keppel, Pasir Panjang and Tanjong Pagar, at Tuas. Through the investment on infrastructure, technology and Research & Development (R&D), the eventual aim is to strength the hub’s connectivity and ultimately cultivate a dynamically efficient, productive and sustainable environment for Singapore’s Maritime sector.

Jenmon International is honoured to be a part of bring PSA Singapore’s sustainability plan into fruition.

This project encompasses Jenmon’s load centering device system. Click here to find out more of Jenmon’s Self Centering Device.

Shanghai Tunnel Engineering Co (Singapore) Pte Ltd (STEC)- The Land Transport Authority (LTA) Jurong Regional Line Construction J102 Project

, Past Project – 2020

Shanghai Tunnel Engineering Co (Singapore) Pte Ltd was appointed by The Land Transport Authority (LTA) for the construction of J102 project.

STEC was contracted to design and construct 3 stations, namely, Choa Chu Kang station, Choa Chu Kang West station, Tengah station and viaduct, including addition and alteration works to the existing Choa Chu Kang station.

These 3 stations are part of Singapore’s upcoming Jurong region line which composes of 24 stations. These stations are targeted to open from 2026 onwards. Through the development of enhancing connectivity, the government aims to foster the creation of a secondary Central Business District in the Jurong area.

Thus, Jenmon International Pte Ltd is delighted to be awarded by STEC for the design, supply, delivery, installation, testing, commissioning and maintenance of 2 units of 60ton double girder gantry cranes and 2 units of 10ton single girder gantry cranes. This gantry cranes will be used for the prefabrication of concrete beams and segments.

Shanghai Tunnel Engineering Co (Singapore) Pte Ltd (STEC) – The Land Transport Authority (LTA) Changi Airport T316 Project

, Past Project – 2020
, Past Project – 2020

The construction of twin bored tunnels from Changi Airport Terminal 5 to Changi Airport (CGA) Station Terminal 2 (T2) North Finger Pier was awarded to Shanghai Tunnel Engineering Co (Singapore) Pte Ltd by The Land Transport Authority (LTA).

Shanghai Tunnel Engineering Co (Singapore) Pte Ltd has once again awarded Jenmon International Pte Ltd to design, supply, deliver, install, test, commission and maintain 2 units of 40ton and 1 unit of 12.5ton double girder gantry cranes for this project. Jenmon is pleased to gain another traction from STEC and is humbled by STEC’s confidence in Jenmon.